GRAPHENE-ENHANCED CONCRETE ADMIXTURE

Stronger. Faster. Greener.

VerteQ is a graphene admixture for ready-mix concrete that doubles compressive strength, collapses cure time from weeks to days, and uses up to 20% less cement — without changing how a single yard is poured.

2× COMPRESSIVE STRENGTH 3–4 DAY CURE 20% LESS CEMENT
3 lb / CY
Standard dose
Compressive strength
3–4 days
To spec strength
35
Real-world projects
THREE WAYS VERTEQ PAYS FOR ITSELF

One product. Three ways to win on your project.

Every concrete project has a bottleneck. Some are bleeding money on schedule. Some are over-buying cement to lift early. Some are facing carbon mandates they can't meet with conventional mixes. VerteQ solves each of them differently.

1
Schedule Acceleration
FOR THE OWNER

Cut weeks off the structural shell. On a single 500,000 sf tilt-up data center, that's ~55 days off the panel campaign — and ~$1.6M of construction-loan and general-conditions cost the owner stops carrying.

~14×
return on admixture spend, carry-cost only
2
Material Substitution
FOR THE CONTRACTOR

Contractors over-design tilt walls to lift early — at the cost of $73K–$117K of extra cement on a single building. VerteQ delivers the same early lift strength without the extra cement. Same outlay, less material, scoreable carbon reduction.

275 t
cement avoided per building (walls only)
3
Design Optimization
FOR THE ENGINEER & OWNER

Spec at 3,000 psi. Deliver 6,000+ psi performance. The strength margin lets engineers safely specify lower design strengths — capturing lower delivered concrete cost and dramatic embodied-carbon reduction across walls, slab, and beyond.

1,200 t
CO₂ avoided per 500,000 sf building
ONE BUILDING. BY THE NUMBERS.

500,000 SF tilt-up data center.

Conventional schedule: ~95 days for the panel campaign alone. With VerteQ: ~40 days. Same crew, same equipment, same supplier — just a different admixture.

55
days off the structural shell
$1.6M
hard-dollar carry savings
1,200 t
CO₂ avoided per building

~$114K of admixture spend protects the front of the critical path. ~14× return on hard dollars — before any credit for earlier revenue, the carbon credit, or the longer life of the structure.

THE DEFENSIBLE DIFFERENCE

Most graphene comes from a mine. Ours comes from biowaste.

Industry-standard graphene is mined from graphite and refined through toxic chemical processes. Expensive. Environmentally regressive. Supply-constrained.

VerteQ's graphene — branded Biocene — is grown from biowaste through a proprietary, non-petroleum, low-carbon process. It's the only graphene-enhanced admixture on the market today whose sustainability story holds up to procurement scrutiny.

And it's the only one a chemistry major can't simply replicate. Multiple patents and trade secrets cover the chemistry, the production process, and the application.

Microscopy view of Biocene graphene embedded in cured concrete
WHERE VERTEQ IS BEING DEPLOYED

Application-agnostic. From tilt-up panels to mass infrastructure.

VerteQ is dispensed through standard ready-mix equipment at 3 lb per cubic yard. It performs across tilt-up panels, slabs-on-grade, footings, columns, beams, and any structural concrete pour. Compatible with Type I, II, III, and Type IL (portland-limestone) cements.

HYPERSCALE
Data Centers

Revenue-at-stake buildings where every day of carry is real money. VerteQ pulls cure time off the critical path and unlocks earlier delivery on tilt-up shells.

Tilt-up panels Equipment slabs Carbon mandates
LUXURY
Resorts & Hospitality

Coastal builds with saltwater exposure and tight grand-opening schedules. Stronger, longer-lived concrete in less time — without changing the construction crew's workflow.

Costa Rica resorts Saltwater durability Schedule-driven
SOVEREIGN
Infrastructure & Stadiums

Saudi Vision 2030. FIFA 2034 stadium build-out. Highway and civil infrastructure. Sovereign-scale programs where carbon scrutiny on every yard meets schedules measured in days.

Vision 2030 FIFA 2034 DOT carbon rules
"

We needed 6,000 PSI. We ordered 3,000 PSI plus VerteQ. Got 7,200 PSI. Framed in a week instead of three. Used 20% less concrete. Saved 15% on steel.

— Field validation, VerteQ-deployed project

THE TEAM

Built by people who've already done it.

Adam Wemhaner
PRESIDENT & CEO

30+ years in global construction and large-scale development. 100+ complex projects delivered. Deep network across developers, contractors, suppliers, and capital partners. Leads VerteQ's commercial buildout, partner strategy, and capital roadmap.

Dr. Greg Leman
CHIEF TECHNOLOGY OFFICER

Former founder and director of multiple technology commercialization and innovation programs at Baylor University. Deep background in specialty materials, process engineering, and R&D portfolio leadership. Leads VerteQ's technical roadmap, lab testing, mix-design rigor, and production scale-up — translating inventor chemistry into specification-grade product at commercial scale.

SENIOR TEAM
RR
Rey Rubio, PE CGC
Inventor & Technical Advisor
AW
Ann Waltos
VP Sales & Marketing
PR
Pavi Ramdehalchand
VP Manufacturing
DR
David Rojek
VP Business Development

Full bios available on request.

Let's talk about your next pour.

If you're specifying for a project, evaluating concrete suppliers, or trying to hit a schedule or carbon target you can't get to with conventional mixes — get in touch. We'll send the technical brief and walk through the numbers on your specific application.

📩 Send an Inquiry Connect on LinkedIn