VerteQ

Concrete Hasn't Changed
in 2,000 Years.
Until Now.

VerteQ is a graphene-enhanced concrete admixture that cuts cure time from 28 days to 3, more than doubles compressive strength, and reduces required concrete and steel by 20% and 15%. Validated in 35 real-world projects.

14 Patents 35 Real-World Projects Bio-Derived Graphene Customers Waiting
Request Executive Summary See How It Works
3-DAY
Cure Time
2X+
Compressive Strength
20%
Less Concrete
15%
Less Steel
The Defensible Difference

The only graphene-enhanced concrete additive that's actually green.

Industry-standard graphene starts in a mine. Graphite is dug up, dunked in toxic chemicals, and refined. The chemistry works, but the environmental footprint is ugly.

VerteQ does it differently. Our graphene, branded Biocene, is grown from composted vegetables via a non-toxic, bio-derived process. Sustainable from inputs to output.

It's not just "concrete that works better." It's the only graphene-enhanced additive that doesn't undo the sustainability commitments developers, sovereigns, and ESG-mandated investors have already made. And the only one a chemistry major can't simply copy in 18 months.

Field-Validated Performance

35 real-world projects. Numbers that change project economics.

VerteQ is dosed at approximately 3 lbs per cubic yard. The results speak for themselves, and they're sitting in slabs across multiple jurisdictions, doing their job today.

3 days
Working strength reached
Down from the 28-day industry standard. Customers frame the next phase within a week instead of three to four.
2.2×
Compressive strength gain
Break tests show 2.2× and above. Order 3,000 PSI, get 6,000+ PSI consistently.
35%
Material savings stack
20% less concrete plus 15% less steel. Direct cost reduction on every pour.

"We needed 6,000 PSI. We ordered 3,000 PSI + VerteQ. Got 7,200 PSI. We were framing in a week. Used 20% less concrete. Saved 15% on steel."

VerteQ Real-World Project #21

The Team

Built by people who've already done it.

Adam Wemhaner
CEO & Co-Founder

30+ years in global construction and luxury hospitality development. 100+ large-scale projects delivered. Deep network across developers, contractors, and material suppliers. Leading VerteQ's commercial buildout and capital strategy.

Rey Rubio, PE, CGC
Inventor & Technical Advisor

Licensed Professional Engineer and Certified General Contractor with 25+ years in materials science and advanced composites. Active member of the American Concrete Institute and ASTM standards subcommittees, helping shape the industry codes for graphene and basalt implementation. 14 patents.

Senior Leadership
GL
Greg Leman
Technical Director, Labs
AW
Ann Waltos
VP Sales & Marketing
PR
Pavi Ramdehalchand
VP Manufacturing
JT
Jeff Thompson
Chief Investment Officer
DR
David Rojek
VP Business Development

Full bios available on request.

Let's talk.

If you're building something that touches concrete, or you fund people who do, request the 2-page executive summary. We're raising a small strategic round to bring the reactor into production this summer.

📩 Request Executive Summary Connect on LinkedIn